Vleuterweide, Utrecht, Netherlands

  • Bygningstype:
  • P-hus

Peikko delivered 1250 meters of DELTABEAM® Composite Beams to construction site.

Prosjektinformasjon

Levert, år:
2009
Ferdigstilt, år:
2010

Mer info

Contacts

Wim Zwaan, Managing Director, Peikko Benelux Mobil +31(0)623807005
Back to reference search